How long does it take for the first rows to dry?

Discuss my database trends and their role in business.
Post Reply
zihadhosenjm40
Posts: 520
Joined: Sat Dec 21, 2024 3:28 am

How long does it take for the first rows to dry?

Post by zihadhosenjm40 »

How to lay out one wall
You need to start laying the wall according to the markings, from the second row from the corner to the center. When the first two rows are laid, everything must be left until the glue is completely dry. Then lay another 4-5 rows and again leave everything to dry. In this way, the entire surface will be laid without displacement. The very first row is laid out last. If necessary, the elements are cut to maintain evenness with the floor covering, baseboard.

After mixing the glue, laying begins with belgium mobile database second row from the floor. This is done from the corner to the center. Having laid the first 2 rows, the work is left until completely dry.

The first rows dry for about a day. Everything depends on the composition of the glue, the humidity in the room, the temperature. The drying hours of the solution are indicated on the packaging of the adhesive composition. From 5 hours (KNAUF) to 12 hours (Ceresit).

You need to wait until it dries completely, otherwise, when laying seamlessly, the upper rows will press on the lower ones, thereby causing a shift.

How to finish corners
In order to finish the corner of the room, you need to measure the distance. If the tile is long, it is cut. On the second wall of this corner, the tile is measured to the edge of the laid elements on the corner. Also cut and fixed.

There is a pre-formed angle available for sale. It is made at 90 degrees. All that remains is to glue it to the surface. This eliminates the possibility of cutting (dust) and taking measurements (may be inaccurate - error in millimeters).

How to lay with wallpaper combination
There are 2 methods to combine cladding with wallpapering:
Post Reply