Marking the rail attachment points

Discuss my database trends and their role in business.
Post Reply
zihadhosenjm40
Posts: 520
Joined: Sat Dec 21, 2024 3:28 am

Marking the rail attachment points

Post by zihadhosenjm40 »

fasteners (bolts, dowels);
drill or hammer drill;
silicone sealant and a special gun;
screwdriver;
building level;
roulette;
masking tape.
Tools for installing a screen

The sliding partition kit usually includes indonesia mobile database profiles, a rail that secures the structure, glass sections, fittings, and special gaskets that protect the elements from moisture.

Step 1. First, you need to secure the profile that holds the screen to the wall. You need to remove the rail from it, adjust its position using a level, and mark the installation points on the surface.

Remove the rail


Step 2. Drill holes at the marked points. If the walls in the bathroom are tiled, it is better to use special drills for tiles. Masking tape will prevent the drill from sliding along the surface of the tile. To ensure maximum strength of fixation, it is recommended to make more than two holes into which you will need to insert dowels.

Apply masking tape

Drill the holes

Hammer in the dowels
Post Reply